North Saskatchewan River Bridge

Location: Edmonton, AB. (N.E. Anthony Henday)
Length: 305m
About:

Constructing two massive 322-meter bridges across the North Saskatchewan River was essential for completing the final link of the Northeast Anthony Henday Drive. Rapid-Span and Canam JV fabricated over 14,000 tons of high-precision structural steel, including massive girders and specialized bearings, through a strategic joint venture. Our advanced manufacturing allowed for the simultaneous production of components for 14 bridges, meeting a rigorous multi-year schedule. This finalized Edmonton’s Ring Road, significantly improving regional commute times and industrial transport efficiency. 

Back To All Projects