Switch Back Creek Bridge

Location: Kamloops B.C.
Length: 48m
About:

Upgrading the crossing at Sun Peaks Resort required a durable solution capable of handling increased traffic and heavy equipment within a sensitive alpine environment. Rapid-Span designed and fabricated a modular steel bridge, specifically engineered for rapid assembly in this remote, high-altitude location. Our off-site manufacturing process minimized environmental disturbance and ensured a high-precision fit for the resort’s infrastructure needs. The result is a robust, low-maintenance crossing that supports year-round resort operations and enhances safety for both visitors and staff. 

Back To All Projects